Development finance

Project Finance Guide for Australia

Project Funding Strategy, Capital Structuring, Lender Coordination and Joint Venture Advisory

Property development finance is one of the most critical components of a successful development project.

A development can have strong fundamentals, planning potential and market demand, yet still fail to proceed if the capital structure, funding strategy or financing execution is not appropriately aligned with the project.

Development finance is therefore much more than obtaining a construction loan.

It involves determining:

  • How much capital the project requires

  • When capital is required

  • How the capital should be structured

  • How much debt the project can support

  • How much equity is required

  • Which lenders are appropriate

  • Whether private capital should be introduced

  • Whether a joint venture is appropriate

  • What security is required

  • What financial conditions need to be satisfied

  • How the project will be funded through each stage

  • How the completed asset or development inventory will ultimately be monetised.

Property Development Australia provides development finance advisory and strategic development management services, coordinating with specialist financiers, lenders, private capital providers, investors and potential joint venture partners to help structure appropriate funding strategies.

Property Development Australia

1. What Is Development Finance Advisory?

Development finance advisory is the process of developing and executing a capital strategy for a property project.

The role can sit between the developer and specialist financial professionals, helping coordinate:

Developer → Development Manager → Finance Adviser → Lender → Equity Investor → Joint Venture Partner

The objective is to ensure that the project’s:

development strategy + feasibility + capital structure + funding requirements

are aligned.

A finance adviser does not simply ask:

“How much can we borrow?”

The more important question is:

“What is the most appropriate capital structure for this particular development, given its risk, timing, returns and exit strategy?”

2. Why Development Finance Strategy Matters

The wrong funding structure can significantly affect:

  • Development profit

  • Equity returns

  • Project timing

  • Cash flow

  • Development risk

  • Control

  • Dilution

  • Interest expense

  • Exit flexibility.

For example, a project may be capable of supporting substantial debt but still be better structured with additional equity if excessive leverage creates unacceptable refinancing or cash-flow risk.

Conversely, using too much expensive equity can unnecessarily dilute the developer’s return.

The objective is to establish a balanced and executable capital structure.

3. The Development Finance Lifecycle

A typical funding process includes:

  1. Project strategy

  2. Development feasibility

  3. Capital requirement assessment

  4. Funding structure

  5. Debt capacity assessment

  6. Equity requirement

  7. Lender identification

  8. Private capital assessment

  9. JV assessment

  10. Funding brief

  11. Information memorandum

  12. Lender/investor engagement

  13. Indicative terms

  14. Due diligence

  15. Valuation

  16. Credit approval

  17. Documentation

  18. Financial close

  19. Drawdown

  20. Construction funding

  21. Monitoring

  22. Refinancing

  23. Project completion

  24. Exit.

Finance should be considered from the beginning of the development process, not immediately before construction.

4. Understanding the Capital Stack

The capital stack describes the different sources of capital funding a development.

A typical structure may comprise:

Senior Debt

The primary secured development facility.

Mezzanine Debt

Additional debt sitting behind senior debt, generally carrying a higher cost.

Preferred Equity

Capital that generally has priority over ordinary equity for distributions, subject to the negotiated structure.

Ordinary Equity

The developer’s and/or investor’s risk capital.

A simplified structure could look like:

Senior Debt

↓

Mezzanine / Subordinated Capital

↓

Preferred Equity

↓

Developer / Ordinary Equity

The appropriate structure depends on the project’s risk profile and the requirements of the capital providers.

5. Development Finance vs Investment Finance

Development finance is different from conventional investment-property finance.

An investment property generally produces established income.

A development project may have:

  • No income

  • Planning risk

  • Construction risk

  • Market risk

  • Cost risk

  • Funding risk

  • Sales risk.

The lender is therefore assessing not only the property but also:

the development strategy + developer + feasibility + approvals + construction + market + exit.

6. Key Development Finance Metrics

Common measures include:

Loan-to-Cost — LTC

Loan ÷ Total Development Cost

Loan-to-Value — LTV

Loan ÷ Property Value

Debt-to-Development-Cost

Used to assess the proportion of total project costs funded by debt.

Equity Contribution

The amount of developer/investor capital required.

Interest Cover

The project’s capacity to service interest from available income or cash flow where applicable.

Presales

Contracted residential sales that can support construction funding.

Pre-Leasing

Committed commercial or retail leases that may support funding and valuation.

These metrics should be considered together rather than individually.

7. Total Development Cost

A lender will generally want a clear understanding of the project’s total cost.

This may include:

  • Land

  • Acquisition costs

  • Stamp duty

  • Legal costs

  • Demolition

  • Planning

  • Consultants

  • Design

  • Authority costs

  • Contributions

  • Infrastructure

  • Construction

  • External works

  • Landscaping

  • Marketing

  • Sales

  • Leasing

  • Tenant incentives

  • Finance

  • Interest

  • Contingency

  • Professional fees.

A detailed cost plan is essential to establishing the funding requirement.

8. Land Funding

Land acquisition can be funded through different structures.

Potential approaches include:

  • Developer equity

  • Senior acquisition debt

  • Private capital

  • Landowner contribution

  • Joint venture

  • Option agreement

  • Conditional acquisition

  • Deferred settlement.

The optimal approach depends on the site’s planning status, acquisition price, development strategy and available capital.

9. Landowner Joint Ventures

A landowner may contribute land instead of selling it outright.

The developer may contribute:

  • Development expertise

  • Equity

  • Finance

  • Project management

  • Development management.

The landowner may contribute:

  • Land

  • Existing planning rights

  • Existing infrastructure

  • Strategic relationships.

The parties can then share the development economics according to the negotiated JV structure.

10. Joint Venture Structures

JV structures can include:

Landowner + Developer

The landowner contributes the site while the developer manages development.

Developer + Equity Investor

The developer contributes expertise and potentially some equity while an investor provides additional capital.

Developer + Institutional Investor

A larger capital partner participates in a major project or portfolio.

Multiple Landowners

Several adjoining landowners combine sites to create a larger development opportunity.

The structure should establish:

  • Contributions

  • Valuation

  • Funding

  • Ownership

  • Decision-making

  • Development management

  • Guarantees

  • Distributions

  • Deadlock

  • Default

  • Exit.

Specialist legal and tax advice should be obtained for the final structure.

11. Private Capital

Private capital can play an important role in Australian property development.

Potential providers include:

  • Private investors

  • Family offices

  • Property investment groups

  • Private equity

  • High-net-worth investors

  • Institutional investors

  • Specialist property funds.

Private capital can potentially provide greater flexibility than conventional senior debt, but the return expectations and control arrangements need to be understood.

12. Private Equity

Private equity may participate where:

  • The project is relatively large

  • Development margins are attractive

  • The developer requires additional equity

  • The risk profile is appropriate.

Equity investors typically assess:

  • IRR

  • Equity multiple

  • Development profit

  • Downside protection

  • Sponsor experience

  • Project risk

  • Exit strategy.

The developer should understand the effect of external equity on both economics and control.

13. Senior Debt

Senior development finance generally provides the primary debt facility.

The lender may assess:

  • Site value

  • Development value

  • Development cost

  • Planning

  • Construction

  • Presales

  • Pre-leasing

  • Developer experience

  • Equity contribution

  • Market conditions

  • Exit strategy.

Senior debt generally sits ahead of other capital in the capital structure and is secured against the relevant assets and/or project interests.

14. Mezzanine Finance

Mezzanine finance can provide additional capital where senior debt does not fully satisfy the project’s funding requirement.

It generally carries a higher cost than senior debt because it takes greater risk.

Potential uses include:

  • Land acquisition

  • Construction

  • Equity gap

  • Working capital

  • Funding optimisation.

The additional cost should be incorporated into the feasibility from the beginning.

15. Bridging Finance

Bridge funding can sometimes be used to address timing gaps.

Examples include:

  • Acquisition before refinancing

  • Settlement before construction finance

  • Planning approval before permanent funding

  • Short-term funding during capital restructuring.

Bridge finance should be assessed carefully because its shorter duration and pricing can materially affect project costs.

16. Construction Finance

Construction finance is typically required once the project is sufficiently advanced.

A lender may require evidence of:

  • Planning approval

  • Building approval/certification

  • Construction contract

  • Fixed or sufficiently developed construction cost

  • Builder capability

  • Quantity surveyor assessment

  • Valuation

  • Presales or pre-leasing

  • Equity contribution

  • Insurance

  • Development program.

Funding is often drawn progressively as construction costs are incurred.

17. Presales

Residential developments often use presales as part of their funding strategy.

Presales can provide:

  • Evidence of market demand

  • Revenue certainty

  • Funding support

  • Reduced sales risk

  • Potential lender comfort.

The quality of presales can matter as much as the headline volume.

Considerations can include:

  • Purchaser quality

  • Contract terms

  • Deposit

  • Settlement timing

  • Product mix

  • Pricing

  • Concentration.

18. Pre-Leasing

Commercial developments can use pre-leasing to support financing.

Potential pre-commitments include:

  • Office tenants

  • Retail anchors

  • Industrial occupiers

  • Medical tenants

  • Government tenants.

A strong lease can support both:

financing

and

completed asset valuation.

19. Development Feasibility and Funding

The feasibility is the foundation of the funding strategy.

It should integrate:

Revenue

  • Residential sales

  • Commercial rents

  • Retail rents

  • Hotel income

  • Industrial sales or leasing

  • Other income.

Costs

  • Land

  • Construction

  • Consultants

  • Infrastructure

  • Finance

  • Marketing

  • Sales

  • Contingency.

Capital

  • Senior debt

  • Mezzanine

  • Equity

  • JV capital.

Returns

  • Development profit

  • Development margin

  • IRR

  • Equity multiple

  • Yield on cost

  • Stabilised value.

20. Funding Gap Analysis

A funding gap occurs where available capital does not fully fund the project’s requirements.

For example:

Total development requirement = $100 million

Senior debt = $60 million

Developer equity = $20 million

Funding gap = $20 million

Potential solutions may include:

  • Additional equity

  • Private capital

  • Mezzanine debt

  • JV partner

  • Landowner contribution

  • Revised development strategy

  • Additional presales

  • Cost reduction

  • Staged development.

21. Capital Structure Optimisation

The objective is not necessarily to maximise debt.

Instead, developers should consider:

Cost of capital + risk + control + return + flexibility

Higher leverage can increase equity returns when a project performs strongly, but it can also increase:

  • Interest expense

  • Refinancing risk

  • Default risk

  • Equity requirements under stress

  • Sensitivity to delays.

Capital structure should therefore be tested under downside scenarios.

22. Interest and Finance Costs

Finance costs can become a significant component of total development expenditure.

The feasibility should model:

  • Base interest

  • Capitalised interest

  • Establishment fees

  • Valuation fees

  • Legal fees

  • Monitoring fees

  • Exit fees

  • Commitment fees

  • Mezzanine costs

  • Equity return requirements.

The funding model should be integrated with the development cash-flow model.

23. Funding Drawdown Strategy

Funding should align with project expenditure.

Typical drawdown requirements may include:

  • Land settlement

  • Planning

  • Consultants

  • Construction

  • Progress claims

  • Marketing

  • Professional costs.

The timing of equity contributions and debt drawdowns should be clearly modelled.

24. Equity Waterfalls

Where multiple equity participants are involved, distributions can be structured through a waterfall.

A simplified example could involve:

  1. Return of capital

  2. Preferred return

  3. Hurdle

  4. Profit split

  5. Promote or performance incentive.

The exact structure should be established through specialist legal, tax and financial advice.

25. Development Management Fees

In a JV or external-capital structure, the developer may receive:

  • Development management fee

  • Project management fee

  • Acquisition fee

  • Asset management fee

  • Leasing fee

  • Performance fee

  • Profit share.

The economics should be transparent and documented before capital is committed.

26. Lender Selection

Not every lender is appropriate for every project.

Potential lender categories include:

  • Major banks

  • Second-tier banks

  • Non-bank lenders

  • Private credit

  • Specialist property financiers

  • Construction financiers

  • Institutional lenders.

Selection should consider:

  • Project type

  • Location

  • Size

  • Planning status

  • Leverage

  • Presales

  • Developer experience

  • Pricing

  • Conditions

  • Flexibility

  • Execution capability.

27. Specialist Finance Advisers

A development finance adviser can assist with:

  • Funding strategy

  • Lender identification

  • Capital structure

  • Funding brief

  • Lender approach

  • Term-sheet comparison

  • Negotiation

  • Due diligence coordination

  • Financial close.

Property Development Australia can coordinate with specialist finance advisers where appropriate.

The objective is to ensure that the financing process is aligned with the broader development strategy.

28. The Funding Brief

A professional funding brief should clearly communicate:

Project

  • Location

  • Site

  • Development description

  • Planning status.

Sponsor

  • Developer

  • Development team

  • Track record.

Feasibility

  • Development cost

  • Revenue

  • Profit

  • IRR

  • Margin.

Funding

  • Total requirement

  • Senior debt

  • Equity

  • Other capital

  • Funding timing.

Security

  • Property

  • Guarantees

  • Corporate structure

  • Other security.

Exit

  • Residential sell-down

  • Asset sale

  • Refinancing

  • Long-term hold

  • Stabilisation.

29. Information Memorandum

For larger projects, an information memorandum may include:

  • Executive summary

  • Development overview

  • Site

  • Location

  • Planning

  • Market

  • Development strategy

  • Masterplan

  • Feasibility

  • Cost plan

  • Funding requirement

  • Capital structure

  • Developer track record

  • Risk analysis

  • Exit strategy.

The document should present the opportunity accurately and professionally.

30. Lender Due Diligence

A lender may require:

  • Title

  • Valuation

  • Planning documents

  • Development approval

  • Building documentation

  • Construction contract

  • Quantity surveyor report

  • Feasibility

  • Presales

  • Leases

  • Environmental reports

  • Geotechnical information

  • Insurance

  • Corporate information

  • Financial statements.

The earlier these documents are prepared, the more efficient the funding process can become.

31. Valuation

Valuation is a critical component of development finance.

Depending on the project, a lender may consider:

  • As-is land value

  • As-if-complete value

  • Gross realisation value

  • Investment value

  • Residual land value.

The valuation methodology should be appropriate to the development type.

32. Quantity Surveyor Review

For construction funding, an independent quantity surveyor may review:

  • Construction cost

  • Development cost

  • Builder contract

  • Contingency

  • Progress

  • Cost-to-complete.

The QS report can become an important component of lender monitoring.

33. Builder and Contractor Assessment

Lenders may consider:

  • Builder experience

  • Financial strength

  • Relevant project experience

  • Contract structure

  • Fixed-price arrangements

  • Program

  • Insurance

  • Construction capability.

Contractor risk can materially affect funding risk.

34. Development Program

Finance strategy should be linked to the development program.

Important milestones include:

Acquisition → Planning → Design → Approval → Finance → Construction → Presales/Leasing → Completion → Settlement → Exit

Delays at any stage can increase:

  • Interest

  • Holding costs

  • Equity requirements

  • Market exposure.

35. Funding for Planning and Pre-Development

Early-stage capital may be required before conventional construction finance is available.

Costs may include:

  • Acquisition

  • Planning

  • Consultants

  • Design

  • Surveys

  • Environmental investigations

  • Legal

  • Feasibility.

Potential sources include:

  • Developer equity

  • Private investors

  • Landowner funding

  • JV capital

  • Short-term finance.

36. Distressed Development Finance

Projects can become distressed due to:

  • Cost overruns

  • Funding shortages

  • Planning delays

  • Contractor failure

  • Weak sales

  • Market changes

  • Refinancing difficulties.

A distressed project may require:

  • Capital restructuring

  • Additional equity

  • New lender

  • JV partner

  • Asset sale

  • Development restructuring

  • Cost reduction

  • Staging.

Early intervention can be critical.

37. Development Refinancing

Refinancing may occur when:

  • Planning is approved

  • Construction begins

  • Construction is completed

  • The asset stabilises

  • Residential inventory remains

  • Existing debt approaches maturity.

The refinancing strategy should be incorporated into the original exit plan.

38. Exit Strategy

A lender and investor need confidence in how capital will ultimately be repaid.

Potential exits include:

Residential

Sell individual dwellings.

Commercial

Sell completed investment asset.

Retail

Sell stabilised centre.

Industrial

Sell completed investment or development stock.

Hotel

Sell or refinance the completed hotel.

Mixed-use

Sell selected components and retain others.

The exit strategy should be realistic and supported by market evidence.

39. Development Finance for Different Property Sectors

Funding requirements vary considerably.

Residential

Focus on:

  • Presales

  • Absorption

  • Construction

  • Settlement

  • End values.

Industrial

Focus on:

  • Land

  • Construction

  • Pre-leasing

  • Tenant covenant

  • Investment value.

Office

Focus on:

  • Pre-leasing

  • Effective rents

  • Incentives

  • Capitalisation rates

  • Development yield.

Retail

Focus on:

  • Anchor tenants

  • Catchment

  • Leasing

  • Stabilised income.

Hotel

Focus on:

  • Operator

  • Occupancy

  • ADR

  • RevPAR

  • Development cost

  • Stabilised value.

Mixed-use

Requires integration of multiple capital and exit strategies.

40. Development Finance for Greenfield Projects

Large greenfield projects can require funding over several years.

Capital may be required for:

  • Land acquisition

  • Planning

  • Infrastructure

  • Civil works

  • Staging

  • Marketing

  • Residential development.

Funding may evolve as the project progresses.

A long-term capital strategy should therefore be established at the beginning.

41. Infrastructure Funding

Major developments can require substantial infrastructure expenditure.

Potential infrastructure includes:

  • Roads

  • Sewer

  • Water

  • Electricity

  • Stormwater

  • Telecommunications

  • Public infrastructure.

Infrastructure funding should be incorporated into the feasibility and development staging strategy.

42. Capital Partner Selection

The right capital partner is not necessarily the party offering the highest headline amount.

Developers should assess:

  • Capital availability

  • Track record

  • Decision-making speed

  • Risk appetite

  • Reporting requirements

  • Control rights

  • Return expectations

  • Exit requirements

  • Relationship approach.

Capital partner alignment can be critical over a multi-year development.

43. Negotiating Term Sheets

Important terms can include:

  • Facility amount

  • Interest rate

  • Fees

  • Loan-to-cost

  • Loan-to-value

  • Term

  • Extensions

  • Security

  • Guarantees

  • Presales

  • Covenants

  • Equity requirements

  • Reporting

  • Events of default

  • Exit fees.

Term sheets should be reviewed by appropriate legal and financial advisers before commitment.

44. Security

Development funding can involve security such as:

  • Registered mortgages

  • General security

  • Guarantees

  • Director guarantees

  • Share security

  • Assignment of contracts

  • Assignment of insurance

  • Assignment of project rights.

The precise security package depends on the financing structure.

45. Risk Management

A finance strategy should address:

Market risk

Revenue may be lower than forecast.

Construction risk

Costs may increase.

Planning risk

Approvals may be delayed.

Interest-rate risk

Finance costs may rise.

Liquidity risk

Capital may not be available when required.

Refinancing risk

Debt may mature before project completion.

Equity risk

Additional equity may be required.

Exit risk

The anticipated sale or refinancing may not occur as planned.

46. Funding Sensitivity Analysis

A sophisticated funding model should test:

  • Interest rates +1%

  • Interest rates +2%

  • Construction costs +10%

  • Construction costs +20%

  • Sales values -10%

  • Rental income -10%

  • Delayed construction

  • Slower presales

  • Slower leasing

  • Lower valuation

  • Higher equity requirement.

The purpose is to determine whether the capital structure remains viable under downside scenarios.

47. Funding Strategy for Mixed-Use Development

Mixed-use developments may require multiple funding strategies.

For example:

Residential → construction finance + presales

Retail → development finance + anchor leasing

Office → development finance + pre-leasing

Hotel → specialist hospitality capital

Retained assets → investment/refinance strategy

The capital structure should therefore reflect the economics of each component.

48. Development Finance Governance

Professional governance becomes increasingly important as projects become larger.

A funding governance framework can establish:

  • Budget approval

  • Drawdown approval

  • Reporting

  • Variations

  • Contingency

  • Forecasting

  • Equity calls

  • Lender reporting

  • Investor reporting

  • Risk escalation.

This helps maintain financial discipline throughout construction.

49. Monthly Development Finance Monitoring

During construction, the development team should monitor:

  • Budget

  • Actual expenditure

  • Forecast cost

  • Cost-to-complete

  • Debt balance

  • Interest

  • Equity

  • Presales

  • Settlements

  • Leasing

  • Valuation

  • Program.

Early identification of variances can allow corrective action before a funding problem develops.

50. The Development Finance Advisory Process

Property Development Australia can assist clients through a structured process:

Step 1 — Understand the Project

Review:

  • Site

  • Planning

  • Development strategy

  • Market

  • Feasibility.

Step 2 — Establish Funding Requirement

Determine:

  • Total project cost

  • Timing

  • Equity

  • Debt

  • Funding gap.

Step 3 — Develop Capital Strategy

Assess:

  • Senior debt

  • Mezzanine

  • Private capital

  • JV

  • Landowner contribution.

Step 4 — Coordinate Specialist Advisers

Engage and coordinate appropriate:

  • Finance advisers

  • Valuers

  • Quantity surveyors

  • Lawyers

  • Accountants

  • Tax advisers

  • Insurance advisers.

Step 5 — Approach Capital Providers

Coordinate engagement with:

  • Banks

  • Non-bank lenders

  • Private credit

  • Investors

  • Family offices

  • JV partners.

Step 6 — Evaluate Proposals

Compare:

  • Pricing

  • Leverage

  • Conditions

  • Security

  • Equity

  • Control

  • Flexibility.

Step 7 — Financial Close

Coordinate the project team through:

  • Due diligence

  • Documentation

  • Conditions precedent

  • Settlement

  • Drawdown.

Step 8 — Monitor

Continue monitoring:

  • Funding

  • Costs

  • Program

  • Equity

  • Debt

  • Forecast

  • Exit.

51. Property Development Australia’s Finance Advisory Expertise

Property Development Australia provides strategic development finance advisory and coordinates with specialist finance professionals and capital providers to help clients develop appropriate funding strategies.

Our services can include:

Funding Strategy

  • Capital requirements

  • Debt/equity analysis

  • Capital stack

  • Funding structure

  • Funding gap analysis

  • Development staging.

Lender Coordination

  • Funding briefs

  • Lender identification

  • Lender engagement

  • Term-sheet coordination

  • Due diligence

  • Funding process management.

Private Capital

  • Private capital strategy

  • Investor presentation

  • Capital partner identification

  • Equity structuring.

Joint Ventures

  • Landowner JV strategy

  • Developer/investor JV

  • Capital partner strategy

  • Commercial structuring coordination.

Feasibility

  • Development feasibility

  • Cash-flow modelling

  • Residual land value

  • Development profit

  • IRR

  • Equity returns

  • Sensitivity analysis.

Development Management

  • Project strategy

  • Planning

  • Design

  • Procurement

  • Construction

  • Risk

  • Program

  • Exit.

52. Why Development Finance Should Be Considered Early

One of the most common development mistakes is treating finance as something to solve after planning approval.

Funding constraints can influence:

  • Land acquisition price

  • Development density

  • Project staging

  • Construction strategy

  • Presales

  • Design

  • Procurement

  • Exit strategy.

The finance strategy should therefore be considered during site acquisition and feasibility, not simply when construction is ready to commence.

53. The Property Development Capital Strategy

A strong development capital strategy can be summarised as:

Project Strategy

↓

Feasibility

↓

Capital Requirement

↓

Debt Capacity

↓

Equity Requirement

↓

Capital Structure

↓

Lender / Investor Selection

↓

Term Sheets

↓

Due Diligence

↓

Financial Close

↓

Drawdown

↓

Monitoring

↓

Refinance / Exit

This creates a structured path from development concept to funded project.

54. Final Development Finance Checklist

Before seeking funding, developers should have:

Project

  • Defined development strategy

  • Site secured

  • Planning position understood

  • Development program prepared

Feasibility

  • Detailed feasibility

  • Cost plan

  • Revenue assumptions

  • Cash flow

  • RLV

  • IRR

  • Sensitivity analysis

Capital

  • Total funding requirement

  • Debt requirement

  • Equity requirement

  • Funding gap

  • Capital stack

Lender

  • Lender strategy

  • Funding brief

  • Valuation

  • QS assessment

  • Builder information

  • Planning documents

Equity / JV

  • Investor strategy

  • JV structure

  • Equity requirements

  • Governance

  • Profit-sharing principles

  • Exit strategy

Due Diligence

  • Title

  • Planning

  • Environmental

  • Geotechnical

  • Construction

  • Insurance

  • Corporate/legal

Exit

  • Residential sales

  • Commercial leasing

  • Retail leasing

  • Asset sale

  • Refinancing

  • Stabilisation strategy

55. Conclusion

Development finance is not simply about finding a lender.

It is about creating a capital strategy that is aligned with the project’s development strategy, risk profile, cash flow, ownership structure and exit plan.

The strongest development finance strategies begin early.

Before acquiring land, developers should understand:

What will the project cost?

How much capital is required?

What level of debt can the project support?

How much equity is required?

Who should provide that capital?

What security and return will they require?

How will the project repay the capital?

What happens if the project is delayed or market conditions change?

These questions should be answered before substantial capital is committed.

Property Development Australia combines development strategy, feasibility, project management and commercial property expertise to help clients navigate the funding requirements of complex Australian property developments.

From senior debt and private capital to joint ventures, landowner partnerships and integrated capital strategies, PDA can coordinate the development team and specialist financial advisers required to take a project from concept through to funding and delivery.